Madrid data center campus

Solution Guides

Powered by 100% renewables, our Madrid campus has huge growth potential of 79 MW at full built. 3 MW is live today and an additional 20 MW is in development right now, with a scheduled for completion in Q1 2027.

June 26, 20266  mins
Iron Mountain Data Centers Madrid campus brochure

Our 60,000 m2 Madrid campus is located in the northeast. Just 10 minutes from Barajas International Airport, the carrier-neutral data center is on top of the main Barcelona-Madrid fiber backbone, and in the heart of Madrid’s new cloud availability zones, giving a huge range of connectivity options. Powered by 100% renewables, the campus has huge growth potential, with 3MW live today an additional 20 MW in development, scheduled for completion in Q1 2027. A total of 79 MW of customer power is allocated for high-speed development, with full campus completion scheduled for Q3 2030. This will soon make it one of the largest data center campuses in Europe.

Whether you are a hyperscale cloud provider, an enterprise, or a government agency looking for a large deployment, our Madrid campus can provide the space, security, standards and power configurations you need

Site highlights

Location:

MAD-1 through MAD-8: Calle Mar Egeo, in San Fernando de Henares, Madrid, Spain

Utility:

Iberdrola, power agreement secured

Building:
  • MAD–2 & 3: 20 MW | 4 x 5 MW Data Halls
  • MAD–6 & 8: 36 MW | 12 MW per Building
Power story:
  • Dedicated 132/20 kV Substation serving MAD–4 & 8
  • MAD–6, 7 & 8: Three dedicated utility supplies with A/B underground feeds
  • MAD–4 & 5: Two dedicated utility supplies with A/B underground feeds
  • MAD–2 & 3: Three dedicated utility supplies with A&B underground feeds
Completion date:
  • MAD–2 & 3: DC02 (Q4 2026) | DC03 (Q2 2027)
  • MAD–4 & 5: Q4 2029
  • MAD–6 & 8: Q4 2030

Building specifications

Current infrastructure
  • 4,000 m2 facility with significant room to grow
  • 4 Data halls
  • Block N+1 redundancy
  • Highly secure facility, parking
  • A/B underground feeds
Cooling
  • MAD 2/3: 10 MW IT (N+2) | Air-cooled, LC-ready
  • MAD 4/5: 10 MW IT (N+2) | Air-cooled, LC-ready
  • MAD 6–8: 12 MW IT (N+2) | Air-cooled, LC-ready
Connectivity
  • Carrier neutral / Cloud neutral
  • Current design allows for 3 diverse Carrier paths with the option of a 4th if required
  • Metro cloud access
  • SDWAN options
  • WAN connectivity options
  • Redundant MMRs, fiber PoE
Nearby

The data center is sited on top of the main Barcelona-Madrid fiber backbone, giving a huge range of connectivity options.

Want to learn more?

Contact a data center team member today!

Get in Touch